''Introduction: Construction''

Previous slide Back to start Mike Sandlin Back to overview Design Hints Next Slide
Back Back to Start Mike Sandlin Overview Design Next

The BUG2-2 construction still goes on

New pics are on the way. What I have to show so far is:
First Complete Assembly
First Complete Assembly
First Complete Assembly
Controls in one Position
Controls in the Other Position
Rudder Cables
Rudder At one Rudder Stop
Rudder At Other Rudder Stop
Fuselage Top Tube Attachment

Wing

Main Wing Strut Attachment
Main Wing Strut Attachment
Aileron Control Rods

Fuselage

Fuselage, Seat, new Wheels and Emergency Wheel(!)
Elevator Attachment
Elevator Strut Attachment
Stabilizer Attachment
Rudder Attachment (Bottom)
Chaos in Front of the Seat
Chaos Behind the Seat
Cockpit with Altimeter
Cockpit with Altimeter
Cockpit Front

Fuselage/Wing

Upper Rear Fuselage Tube Attachment
Lower Rear Fuselage Tube Attachment
Lower Wing Attachment
Lower Wing Attachment
Upper Left Wing Attachment and Pulleys
Upper Left Wing: Cables and Tensioners
Upper Left Wing: Cables and Tensioners
Upper Right Wing: Outer Edge
Upper Right Wing: Outer Edge
Lower Right Wing: Tiedown Eye

Workspace filling up:

Workspace Filling Up
Workspace Filling Up
Workspace Filling Up
Unfolding a Wing Half in the Basement
Workspace Filling Up
Assembling Fuselage
Assembling Fuselage
Assembling Fuselage
Assembling Fuselage
Assembling Fuselage

Etcetera

Seatbelt Attachment


Based upon the excellent work of Mike Sandlin. Thank you Mike.

Hendrik Maroske