''Introduction: Construction''
|
|
|
|
|
|
Back |
Back to Start |
Mike Sandlin |
Overview |
Design |
Next |
The BUG2-2 construction still goes on
New pics are on the way. What I have to show so far is:
First Complete Assembly
First Complete Assembly
First Complete Assembly
Controls in one Position
Controls in the Other Position
Rudder Cables
Rudder At one Rudder Stop
Rudder At Other Rudder Stop
Fuselage Top Tube Attachment
Wing
Main Wing Strut Attachment
Main Wing Strut Attachment
Aileron Control Rods
Fuselage
Fuselage, Seat, new Wheels and Emergency Wheel(!)
Elevator Attachment
Elevator Strut Attachment
Stabilizer Attachment
Rudder Attachment (Bottom)
Chaos in Front of the Seat
Chaos Behind the Seat
Cockpit with Altimeter
Cockpit with Altimeter
Cockpit Front
Fuselage/Wing
Upper Rear Fuselage Tube Attachment
Lower Rear Fuselage Tube Attachment
Lower Wing Attachment
Lower Wing Attachment
Upper Left Wing Attachment and Pulleys
Upper Left Wing: Cables and Tensioners
Upper Left Wing: Cables and Tensioners
Upper Right Wing: Outer Edge
Upper Right Wing: Outer Edge
Lower Right Wing: Tiedown Eye
Workspace filling up:
Workspace Filling Up
Workspace Filling Up
Workspace Filling Up
Unfolding a Wing Half in the Basement
Workspace Filling Up
Assembling Fuselage
Assembling Fuselage
Assembling Fuselage
Assembling Fuselage
Assembling Fuselage
Etcetera
Seatbelt Attachment
Based upon the excellent work of
Mike Sandlin. Thank you Mike.
Hendrik Maroske